Approval for heating and ventilation systems
The procedure for admission into operation boilers, heating systems and thermal power plants.
In accordance with Article 539. Civil Code contract concluding etsya power to the subscriber in the presence of the latter in charge with the technical requirements Niyama power receiving device connected to the power supply networks, the organization.
"Rules of technical operation of thermal power plants" (registered Minyus-volume RF 02.04.03g. № 4358) and "Guidelines for the admission of new and re-designed by electrical and thermal power plants' tolerance to determine the order of operation and connection of new and refurbished electrical and heat-energous tanovok consumers of electricity and thermal energy, equipment and basic facilities of power plants, electric and thermal networks of organizations, regardless of their affiliation and ownership, as well as individual entrepreneurs and citizens.
Approval for the thermal power plants in the following order:
1. After completing the project (prior to construction works) the customer is in the bodies of RTN validation and approval of design documentation.
2. Upon completion of installation and making the act of acceptance of the power plant installation, the client sends to the inter-regional management of technological and ecological supervision a written statement of willingness to thermal power plants and heat networks (TEU and TC) for the admission. At the same time provide documentation in accordance with application number 1 and (or) 2. All mounted and reconstructed TEU and TC should have a project, acceptance and operational documentation, provided by trained and Atta-stovannym support staff (may be a contract for services with a specialized organization with the appropriate license), proven remedies, tools, spare parts, communication and alarm systems, fire fighting, emergency lighting and ventilation. Shall be appointed by order al-testovannye in the prescribed manner, those responsible for operative condition and security operation Pasni TEU and TS.
3. Admission teploustanovok performed in the presence of an act of tolerance of electrical installations, resolution-sheniya to operate the equipment from the department for supervision of facilities, working under pressure and of surveillance systems, water supply (if necessary).
4. Documentation submitted is considered in Rostekhnadzor in case the preliminary examination and verification of the project within 5 working days, without prior review of the project - 10 working days. Upon review of the applicant to inform the Xia-motivated comments on the quality and volume of documentation submitted, and agreed the date of the inspection and TEU CU.
5. Inspection carried out an inspector with a representative RTN-chica order, involving, if necessary, staff assembly, commissioning and oper-regulating organization.
6. In case of deviations from the design documentation of violations of the installation of existing normative and technical documents, the inspector is to act Prescription exhaustive list of deficiencies and defects at the time of inspection. After elimination of deficiencies and TEU CU offered for re-inspection, which takes place within 5 days after re-treatment.
7. In the absence of comments the inspector shall be drawn up, the admission of a temporary connection for the commissioning and testing of TEU and the TC. The act of a supervisor is made in duplicate. One copy of the approval sent to the owner-admits-Kai object. Validity of acts set to no more than 6 months. If those in-chenie this period of the above are not met, as well as the materials are not on the work, the installation shall be shut down and carries out the admission again.