Tools
LOADING
PREV
NEXT
http://www.tehkaskad.ru/components/com_gk3_photoslide/thumbs_big/875244about.jpg
http://www.tehkaskad.ru/components/com_gk3_photoslide/thumbs_big/100439861929DSC00532.JPG
http://www.tehkaskad.ru/components/com_gk3_photoslide/thumbs_big/50086367428220954.jpg
http://www.tehkaskad.ru/components/com_gk3_photoslide/thumbs_big/138232472848IR000792.jpg
http://www.tehkaskad.ru/components/com_gk3_photoslide/thumbs_big/529290620889DSC00536.JPG
http://www.tehkaskad.ru/components/com_gk3_photoslide/thumbs_big/294760753494e4_foto_1.jpg

  • About
  • Our experts
  • Energy Audit
  • Thermal imaging survey
  • Hardware
  • Complex "Ptero"

About

Full range of consulting services in energy and energy efficiency

Readmore

Our experts

Highly qualified specialists are always ready to perform the most complex projects

Readmore

Energy Audit

LLC "TehExergo-Kaskad" conducts energy audits of any complexity

Readmore

Thermal imaging survey

The company's specialists use an effective method to control the spatial distribution of heat flow

Readmore

Hardware

LLC "TehExergo-Kaskad" has all the necessary instruments for the instrumental testing facilities

Readmore

Complex "Ptero"

One of the first energy auditing companies applying for the examination of objects drones

Readmore
Saturday, 19 May 2012

Открыты вакансии!

ВНИМАНИЕ!!!

В связи с участившимися случаями подделки технических отчетов, с 1 ноября 2011 года все отчеты нашей компании комплектуются разрушаемой голограммой!

Approval for electrical installations


The procedure for putting into operation of electric companies regulated by the "Rules of Technical Operation of Electrical Equipment (PTEEP)" and the Order of the Federal Service for Ecological, Technological and Nuclear Supervision N 212 "On approval of the Works to issue permits for Approval for power plants" of 07.04.2008.


Order determines the order of admission to the operation and connection of new and refurbished electrical installations, regardless of their affiliation and ownership, as well as individual entrepreneurs and citizens.

According to the Order "... Admission includes checking the electrical power plant project compliance with the requirements of normative documents, the quality of installation and commissioning, the possibility of further operation of power plants in compliance with the requirements for its safe service ...
Admission of new and renovated power plant inspection is made an act of power plants and permission for admission to the service ... If within three months of power plant is not technically connected to the network, its admission into operation is carried out repeatedly.
Inspection carried out an inspector MTU power unit with a representative RTN its owner (responsible for electrical and / or teplohozyaystvo) with the assistance of staff if necessary, installation and commissioning organizations.
... In case of deviations from the design documentation of violations in the installation and commissioning of existing normative and technical documents, the inspector shall be drawn-order with indication of the violations and deviations. "

Thus, the main result of putting into operation of electrical installations, is to obtain from an inspector RTN electrical admittance of the Act into operation.

To do this, call the inspector osuschestvlyaetya (letter to the head office RTN), followed by a demonstration performed by wiring kit and documentation:

Resolution on the accession of power;
The act of carrying liability division, agreed with the HOA, the ISS power sales;
Draft internal electrical agreed with Rostekhnadzor and power sales;
Acts on the installation, the license;
Technical Report on electro license;
Documents on the responsible persons for the electrical equipment;



Requirement documents for those responsible for the electrical equipment is regulated PTEEP: "... For the direct implementation responsibilities to organize the operation of electrical ... appointed responsible for the electrical equipment the organization and his deputy ... Appointment of electrical equipment, and his deputy shall be made after verification and knowledge of the assignment ( in electrical voltage up to 1000) IV-group on electrical safety. " Documents include journal knowledge test and a certificate of responsible, with the mark of inspection and stamped RTN organization.

Responsible for the electrical equipment individuals also take part in the admission of electrical systems in operation

The cost of obtaining these documents in this section can be determined based on the information you input information.

News of company

  • 0
  • 1
  • 2
prev
next

Works on SUEK are finished

Works on Power inspection of systems теплогенерирования (heat supplies) and теплопотребления objects of the Siberian coal power company (SUEK) are finished: Open Society "SUEK-HAKASIJA", Open Society "Primorskugol", Open Society "Ugralugol", ...

Новости компании | Monday, 1 August 2011

Readmore

Works on "GazOjl-Plaza" are finished

Works on Power inspection of systems of ventilation and air-conditioning, water consumption and water removal of a building of business centre "GazOjl-Plaza" are ...

Новости компании | Monday, 18 July 2011

Readmore

Works on drawing up of Power passports a

Works on drawing up of Power passports of Open Society "SUEK-KRASNOJARSK", Open Company «Borodino RMZ» (RMZ - mechanical-repair factory), Open Company «Nazarovsky RMZ», Open Society «the Cut Tugnujsky», Open Company ...

Новости компании | Friday, 1 July 2011

Readmore

World News of Energy

Error: Any articles to show



GIAgency